Standardized Construction Framework
Homello follows a unified construction framework across all projects. Each stage has clear checkpoints, acceptance standards, and accountable owners.
Stage 1: Site Preparation
- Site protection and zone marking before demolition
- Utility and structural risk checks before work starts
- Dust control and waste removal plans defined in advance
Stage 2: Structural and Utility Works
- All routing follows approved drawings and constraints
- Hidden works are inspected before being covered
- Trade interfaces are documented and signed off at milestones
Stage 3: Finishing and Installation
- Flatness, alignment, and joint quality checked by tolerance standards
- Cabinet, fixture, and hardware installation tested for stability
- Defect lists must be closed before final handover
Quality and Safety Management
- Quality: stage inspections plus final acceptance checklist
- Safety: on-site protection, electrical checks, and tool discipline
- Issue tracking: responsible owner and closure timeline for each issue