Construction Standards 施工标准

Standardized Construction Framework

Homello follows a unified construction framework across all projects. Each stage has clear checkpoints, acceptance standards, and accountable owners.

Stage 1: Site Preparation

  • Site protection and zone marking before demolition
  • Utility and structural risk checks before work starts
  • Dust control and waste removal plans defined in advance

Stage 2: Structural and Utility Works

  • All routing follows approved drawings and constraints
  • Hidden works are inspected before being covered
  • Trade interfaces are documented and signed off at milestones

Stage 3: Finishing and Installation

  • Flatness, alignment, and joint quality checked by tolerance standards
  • Cabinet, fixture, and hardware installation tested for stability
  • Defect lists must be closed before final handover

Quality and Safety Management

  • Quality: stage inspections plus final acceptance checklist
  • Safety: on-site protection, electrical checks, and tool discipline
  • Issue tracking: responsible owner and closure timeline for each issue

标准化施工框架

华美乐在所有项目中执行统一施工框架。每个阶段都有明确的检查节点、验收标准与责任人,确保交付质量稳定可控。

阶段一:现场准备

  • 拆改前完成成品保护与施工分区标识
  • 开工前完成水电与结构风险排查
  • 提前制定扬尘控制与垃圾清运计划

阶段二:结构与水电施工

  • 所有走线走管严格按图纸与技术规范执行
  • 隐蔽工程在封闭前必须完成节点验收
  • 工种交接界面在里程碑阶段留档确认

阶段三:饰面与安装

  • 平整度、垂直度、拼缝质量按标准公差检查
  • 柜体、五金、洁具安装完成后进行功能稳定性测试
  • 交付前完成问题清单闭环整改

质量与安全管理

  • 质量管理:阶段验收 + 竣工验收双重机制
  • 安全管理:现场防护、电气安全、工具使用规范执行
  • 问题处理:问题到人、到时限、到结果的闭环机制